Collaboration Project with MPA and Bluenergy Solutions
Installation of AIS system
We are delighted to have the opportunity to support a green initiative through our work with Bluenergy Solutions. The Bluenergy Station delivers renewable marine energy solutions. In a collaboration project with MPA, a container with solar panels will be placed on a barge out at sea. We were engaged to install an AIS system in the yellow container unit.
As with all installations, we advise the crew on the placement of equipment and antennas. A generic briefing on the considerations for product placement was given before agreeing on place. The technical team takes care of the electrical wiring and the AIS and antennas are installed. Final checks are conducted and the barge is ready for sea.