TECHNO LIFEBOAT PTE LTD
MSC.1/Circ.1392 Lifeboat Hook Modification
New SOLAS regulation III/1.5 requires that for all ships, on-load release mechanisms not complying with paragraphs 4.4.7.6.4 to 4.4.7.6.6 of the LSA Code, as amended by resolution MSC.320(89), be replaced or modified not later than the next scheduled dry-docking after 1 July 2014, but not later than 1 July 2019.
Our lifeboat team had the opportunity to carry out lifeboat hook modification.
- The lifeboat is offlanded and its hook assembly is stripped in preparation for the installation of components.
- Our technicians work on the hooks in shipyard.
- The releaser is renewed, and installed with safety pin and new labels.
- Post-installation testing is carried out on both port and starboard lifeboats, in compliance with IMO recommendations.
- 1 x load and simultaneous release test according to the Revised recommendation on testing of life-saving appliances (resolution MSC.81(70) is carried out, along with sea trial.